FE-SEM Specimen Exchange

NOTE: ALWAYS USE GLOVES WHEN HANDLING SPECIMENS AND HOLDERS!

Metal height gauge with fixed height piece.

1. Always check the specimen height using the height gauge.


FE-SEM infrared chamberscope system.

2. Turn on the chamber camera and monitor.


FE-SEM chamber evac and air switch.

3. Ensure that the vacuum readings are within range. Make sure the "SEC" switch position is selected on the front panel, and hit the AIR button to vent the exchange chamber.


FE-SEM specimen exchange system exterior.

4. Pull the door open by grabbing the door itself, not the rod.


Gloved fingers working the sample holder.

5. Screw the specimen holder onto the end of the rod.


6. Pull the rod back into the locked position and close the door.


FE-SEM chamber evac and air switch.

7. Press the EVAC button to evacuate the exchange chamber.


FE-SEM chamber vacuum light on high.

8. Wait until the SEC vacuum reads "high" on the front panel.


FE-SEM exchange chamber handle MV1 showing open and close markings.

9. Turn the handle counterclockwise to open MV1.


10. While observing the chamber camera, push the rod onto the dovetail on the stage and unscrew the rod.


11. Pull the rod out until it locks and close MV1. You do not need to AIR the chamber!


Operating Procedure: Flashing